AT A GLANCE
Second-Source (Plan B) Specialty Lubricant Validation Protocol Under IATF 16949
Step-by-step engineering benchmark for qualifying a drop-in Plan B lubricant supplier: FTIR/rheology matching, plastic/elastomer pre-testing, and PPAP / IATF 16949 sign-off.
01 / EXPLORE THE AREAS
Key application points
Lab Cross-Match
Align NLGI consistency, base-oil viscosity, and dropping point to current spec.
- RECORD
- Base-oil & thickener miscibility check
Part-Level Verification
Run cold-start, thermal shock, and endurance cycles on production parts.
- RECORD
- 72h–500h accelerated polymer & seal aging
Audit Readiness
Lock lot-to-lot COA limits under IATF 16949 and QC 080000 quality control.
- RECORD
- IATF 16949 batch traceability & PPAP dossier
02 / PLAN THE REVIEW
From records to part testing
- 01
Define a consistent starting point
Record materials, process, current material and the issue. Specify which conditions will change during the comparison.
- 02
Check grade records
Review the current TDS/SDS and test conditions. Separate documented properties from checks requiring actual parts.
- 03
Use matching test criteria
Define the method and acceptance criteria. Record changes before and after treatment or repeated evaluation under consistent conditions.
03 / CONTINUE THE REVIEW
Discuss your component
Specialty lubricantsAdd the conditions you know to the enquiry checklist. If the grade is undecided, start with the requirements needed to review candidates and records.
